turnkey canned Tuna making machine
Production Process (Raw Material: Tuna)
Raw Material → Thawing → Conveying → Evisceration → Washing → Conveying → Cooking (Steaming) → Cooling → Removal of Head, Tail, and Bones (including red meat removal) → Conveying → Plate Loading → Can Filling → Weighing & Correction → Sauce Addition → Vacuum Sealing Machine → Can Washing Machine → Cage Loading → Sterilization → Cage Unloading → Inspection → Labeling → Coding → Boxing → Warehousing
Equipment List
No. |
Equipment Name |
Model/Specification |
Quantity |
Remarks |
1 |
Steaming Box |
2200*1500*2200mm |
1 set |
SUS304 |
2 |
Steaming Cart |
930 × 880 × 1600mm |
6 units |
SUS304 |
3 |
Spray Cooling Chamber |
– |
1 set |
SUS304 |
4 |
Red Meat Removal Conveyor |
6 × 1.5 × 1.4 m |
1 unit |
SUS304 |
5 |
Fish Meat Metal Detector |
– |
1 unit |
SUS304 |
6 |
Fish Meat Disintegrator |
– |
1 unit |
SUS304 |
7 |
Weighing & Can Filling (Manual) |
6000*1400*1500 |
|
|
8 |
Soup Adding Conveyor |
2000*700*1600mm |
1 unit |
SUS304 |
9 |
Canned Sealing Machine |
30 cans/min |
1 unit |
Cast Iron |
10 |
Transfer Conveyor |
– |
1 unit |
SUS304 |
11 |
In-Can Washing Machine |
– |
1 unit |
SUS304 |
12 |
Manual Cage Loading/Unloading Machine |
– |
1 set |
SUS304 |
13 |
Sterilization Pot |
|
1 set |
SUS304 |
14 |
Sterilization Basket |
– (4 pieces) |
4pieces |
SUS304 |
15 |
Chain Conveyor |
50 m |
– |
Tentative |
16 |
Drying Machine |
– |
1 unit |
SUS304 |
17 |
Coding Machine |
– |
1 unit |
Shanghai |
18 |
Labeling Machine |
– |
1 unit |
Tianjin |
19 |
Boxing Conveyor |
1000*2000*900mm |
1 unit |
SUS304 |
20 |
Empty Can Stacker |
– |
1 unit |
SUS304 |
21 |
Magnetic Can Washing Machine |
– |
1 unit |
SUS304 |
22 |
Soup Mixing Tank |
150 L |
2 units |
SUS304 |
23 |
Sanitary Pump |
3 T/h |
2 units |
Food-Grade |
24 |
Piping, Valves |
– (1 set) |
– |
Tentative |
25 |
Control Electrical Cabinet |
– (1sets) |
1 sets |
Schneider |
Notes:
1.The piping and valves connecting the equipment are not included in this quotation. They will be quoted separately after the workshop layout plan is finalized (material prices are based on current market prices and may be adjusted in the future based on market fluctuations).
2.Except for equipment manufactured by the designated suppliers mentioned in the initial remarks, all other equipment is produced by our factory.
3.The final detailed list will be verified after the workshop layout plan is completed.